👤 Active Member: Team Expert
🔒 Logout
Risemark Solar Corporate Proposal Dashboard
Flexible Profit Margin & 8.9% Fixed GST Commercial Calculator
⚙️ Choose Proposal Calculation Mode:
1. Client Profiling & Consultant Details
🔧 Installation, Civil, Freight & Additional Direct Base Inputs
🛠️ Custom Bill of Quantity (BOQ Pure Base Rates)
Enter quantities for materials below. Calculated directly on pure base rates (Qty × Rate).
🔧 Installation, Civil, Freight & Additional Direct Base Inputs
Calculated Total Custom BOQ & Service Base Cost:
₹0
2. Technical Component Mappings
3. Commercial Planning & Profit Margin Strategy
💰 Profit Planning & 8.9% Fixed GST Matrix
Total Base Cost (Material+Labor)
₹0
Risemark Net In-Hand Profit
₹0 (0%)
Compile & Generate 4-Page Proposal
Proposal ID:
Date:
TECHNICAL & COMMERCIAL PROPOSAL
ON-GRID SOLAR ROOFTOP POWER PLANT
SYSTEM CAPACITY: 3.10 KWp
Prepared For:
1. Risemark Solar Design Layout & Structural Engineering Standards
Every power plant executed by our engineering cell undergoes detailed 3D shadow mapping and cross-sectional optimization.
Reference 1.1: 3D Plant Space & Azimuth Model
Reference 1.2: General GI Mounting Dimension Chart
2. Financial Payback Analytics & Long-Term SIP Wealth Creation
1. Engineering Component & Brand Ecosystem
2. Estimated Seasonal Generation Curves (Dynamic Monthly Breakup)
3. Ecological Sustainability Mapping
CO₂
Tons
Carbon Offset (25 Yrs)
🔥
Tons
Coal Saved Annually
4. Required Documents for DISCOM Registration & Subsidy Processing
📄 1. Cheque / Passbook Clear Copy (For Subsidy)
🪪 2. Aadhaar Card Front & Back
🆔 3. PAN Card Copy
💡 4. Latest Electricity Bill
⚡ 5. Existing Electricity Meter Photo
📸 6. GPS Site Photo with Customer
📱 7. Registered Mobile No. & Email ID
📑 8. Property Tax Slip / Registry Copy
Client Name:
Client Mobile:
Site Location:
Proposal ID:
System Capacity: KWp
Prepared By:
1. Commercial Turnkey Investment Summary
Terms of Payment
20% Advance: Token booking amount.
70% Readiness: Staging prior to dispatch.
10% Retention: Post installation closure.
Corporate Bank Framework
🏛️ Beneficiary: Risemark Solar Private Limited
🔢 Account No: 926020000316326
🏢 Bank: Axis Bank Ltd. | Bengali Square, Indore
🔑 IFSC Code: UTIB0001514
2. Operational Pre-requisites & Site Readiness
Utility Liaisoning & Subsidy: Subject to a "No Dues" profile. Subsidy disbursed directly by Central Govt DISCOM portal into Aadhaar-linked bank account.
Site Requirements: Clear shadow-free roof required. Construction water/power during pedestal casting arranged by client.
Volatile Capping: Binding commercial rate holds structural stability for 7 days only .
Jurisdiction Covenants: Obligations bounded strictly under INDORE jurisdiction.
1. Save as PDF / Export
2. Share on WhatsApp