šŸ“‚ Saved Proposals Database History

Proposal ID Client Name Mobile KW Turnkey Price Prepared By Action
Loading proposals history...

1. Client Profiling & Consultant Details

2. Technical Component Mappings

Array 1 Rate: ₹8,990.00 / Panel
Total Plant Power: 0 W (0.00 kW)

3. Balance of System (BOS) & Direct Services Breakdown

Select components included in the client's scope:
BOS Component / Service Scope Include / Scope Base Amount (₹)
1. Mounting Structure ••••••
2. Solar AC / DC Cabling & Wires ••••••
3. ACDB & DCDB Distribution Boxes ••••••
4. Chemical Earthing Kit & LA Spike ••••••
5. Other BOS Materials & Accessories ••••••
6. Installation & Commissioning Base ••••••
7. Civil Foundation & Pedestal Work ••••••
8. Freight / Loading / Logistics ••••••
9. Additional Site Cost (If Any) ••••••

4. Commercial Quotation Setup

Proposal ID:
Date:
TECHNICAL & COMMERCIAL PROPOSAL
ON-GRID SOLAR ROOFTOP POWER PLANT
SYSTEM CAPACITY: 3.00 KW
Solar Kit Components
Prepared For:
Technical & Financial Feasibility

1. Risemark Solar Design Layout & Structural Engineering Standards

Every power plant executed by our engineering cell undergoes detailed 3D shadow mapping and cross-sectional optimization.

3D Roof Plant Model
Reference 1.1: 3D Plant Space & Azimuth Model
GI Structure Dimensions
Reference 1.2: General GI Mounting Dimension Chart
Performance Criterion Simulated Structural Value Analytical Significance
Performance Ratio (PR) 86.35% Premium baseline system efficiency under climate indices.
Annual Solar Access 99.56% Shadow Free Pristine azimuth structural orientation safeguards zero shade loss.
Estimated Annual Production Units / Year Net green power offset expected in Year 1.
Linear Degradation Framework 1% 1st Year, 0.5% onwards regular yrs Standard multi-tier technology safeguard capping yearly degradation.

2. Financial Payback Analytics & Long-Term SIP Wealth Creation

Estimated Annual Generation: Units / Year
Estimated Annual Savings:₹ / Year
Return on Investment (ROI): Years
Operation & Maintenance:5 Years Free O&M
Solar Utility Savings SIP Mapping
Technical Component Ecosystem & Required Documents

1. Engineering Component & Brand Ecosystem

Component Class Selected Engineering Specifications & Brand Ecosystem Warranty Framework

2. Estimated Seasonal Generation Curves (Dynamic Monthly Breakup)

Units
0
Jan
0
Mar
0
Apr
0
Jun
0
Aug
0
Oct
0
Dec

3. Ecological Sustainability Mapping

COā‚‚
Tons Carbon Offset (25 Yrs)
šŸ”„
Tons Coal Saved Annually
🌳
Trees Trees Saved

4. Required Documents for DISCOM Registration & Subsidy Processing

šŸ“„ 1. Cheque / Passbook Clear Copy (For Subsidy)
🪪 2. [Aadhaar Redacted] Front & Back
šŸ†” 3. PAN Card Copy
šŸ’” 4. Latest Electricity Bill
⚔ 5. Existing Electricity Meter Photo
šŸ“ø 6. GPS Site Photo with Customer
šŸ“± 7. Registered Mobile No. & Email ID
šŸ“‘ 8. Property Tax Slip / Registry Copy
Commercial Quotation Matrix
Client Name:
Client Mobile:
Site Location:
Proposal ID:
System Capacity: KW
Prepared By:

1. Commercial Turnkey Investment Summary

Scope of Work & Turnkey Description Qty Total Amount (Excl. Tax)
Project Commercial Base Value: ₹0
Statutory Applicable GST (8.9% Fixed): ₹0
Gross Turnkey Investment Capital (GST Included): ₹0
Terms of Payment
  • 30% Advance: Token booking & engineering confirmation amount.
  • 70% Readiness: Staging prior to material dispatch & execution.
Corporate Bank Framework
šŸ›ļø Beneficiary: Risemark Solar Private Limited
šŸ”¢ Account No: 926020000316326
šŸ¢ Bank: Axis Bank Ltd. | Bengali Square, Indore
šŸ”‘ IFSC Code: UTIB0001514

2. Operational Pre-requisites & Site Readiness

  • Utility Liaisoning & Subsidy: Subject to a "No Dues" profile. Subsidy disbursed directly by Central Govt DISCOM portal into bank account.
  • Site Requirements: Clear shadow-free roof required. Construction water/power during pedestal casting arranged by client.
  • Volatile Capping: Binding commercial rate holds structural stability for 7 days only.
  • Jurisdiction Covenants: Obligations bounded strictly under INDORE jurisdiction.